Sunday, February 28, 2016

Craft Desk Project Overview - Window Move and Flooring Install



Had wanted to build a craft area for my wife for quite some time.  Most of her stuff was strewn about the Dining Room which wasn't being used as a result.  Decided to use part of the bonus room above the garage.
This was the space prior to beginning.  First step was to move that window to the left.

New hole framed in.  Of course there was a wire in that space that I had to move!

View from the outside.  Siding carefully removed.

Window moved and old space framed in and insulated.

Exterior view of area sealed in and ready for siding.

Exterior completed

Interior with drywall insatlled.

Wall done and carpet ripped up on half the room
New flooring going down

Bamboo Flooring completed.  Ready for Desk finally!

No comments:

Post a Comment